A Road Safety Audit is a formal examination of proposed or existing roads and road related areas from the perspective of all road users with the intention of identifying road safety deficiencies and areas of risk that could lead to road crashes. It is conducted by an independent, qualified team of professionals.
A road user refers to any individual or entity that uses a road or highway for transportation purposes.
Road users include all motorists (cars, trucks, motorcyclists, buses), pedestrians (including mobility and visually impaired), cyclists, maintenance, and construction workers (roadworks). The term encompasses all individuals who interact with and navigate through the road system, emphasizing the diverse nature of transportation and the need for comprehensive road planning and design to accommodate various modes of travel and ensure safety for all road users.
Road Safety Audits are a pro-active approach to road safety. Road Safety Auditing continues to make a significant contribution to saving lives and reducing serious injury on the road networks of Australia. It is a long standing, internationally recognized process which identifies road safety related risks and hazards to road users during defined stages of a road’s life cycle with the objective to eliminate or mitigate road user safety risks.
A Road Safety Audit aims to improve road user safety and provide a safe road environment by influencing a project team to provide a forgiving road environment, incorporating design features to prevent death or serious injury to all road users in the event of a crash. Safe roads minimize exposure, likelihood and severity of all road type crashes.

A practical and professional service identifying road safety risks during all stages of a project. Our auditors are accredited to undertake Road Safety Audits in NSW, VIC, QLD, SA & NT.

Our Road Safety Auditors bring a diverse array of engineering expertise ranging from road safety engineering, road design, traffic engineering, traffic management and construction, allowing the audit team to assess projects from a variety of perspectives.

Proven track record delivering road safety audits on time and within budget, without compromising audit quality. Our audits are often completed within 5 business days post commission.
A practical and professional service identifying road safety risks during all stages of a project. Our auditors are accredited to undertake Road Safety Audits in NSW, VIC, QLD, SA & NT.
Our Road Safety Auditors bring a diverse array of engineering expertise ranging from road safety engineering, road design, traffic engineering, traffic management and construction, allowing the audit team to assess projects from a variety of perspectives.
Proven track record delivering road safety audits on time and within budget, without compromising audit quality. Our audits are often completed within 5 business days post commission.












Prepare a road safety audit brief.
Select the road safety audit team.
Gather project background information.
Hold a commencement meeting.
Audit all information received.
Use online resources to review existing site conditions.
Undertake a day & night physical field inspection (if required).
Prepare the draft report & identify road safety findings.
Hold a completion meeting to discuss the draft report & the road safety findings.
Issue the final report.























Date: 2021 - 2022
Project Princes Highway and Waratah Street Intersection Upgrade (Concept & Detailed Design)
Client: MRB Technical Services & TfNSW
Project Value: $15.2M
SEE MORE DETAILS
Date: 2022
Project Great Western Highway Upgrade - Coxs River Road Roadworks Road Safety Audit (RSA)
Client: Jacobs & TfNSW
Project Value: $2.5B
SEE MORE DETAILS
Date: 2021
Project Bondi Junction Cycleway & Streetscape Upgrade - Stage 5 (Oxford Street)
Client: FORD CIVIL
Project Value: $6 M
SEE MORE DETAILS
Date: 2023
Project Bylong Valley Way Level Crossing
Client: BG&E & ARTC
Project Value: $14 M
SEE MORE DETAILS
Date: 2021
Project 55-57 Hallam South Road, Hallam
Client: iSProperty
Project Value: N/A
SEE MORE DETAILS
Date: 2022
Project Heavy Vehicle Alternative Route – Withers Lane & Dead Horse Lane, Mansfield
Client: JJ RYAN
Project Value: $3.9M
SEE MORE DETAILS
Date: 2022
Project Port Botany Rail Duplication - Southern Cross Drive Central Pier Works - Traffic Management Plan
Client: Turnbull Engineering
Project Value: $400M
SEE MORE DETAILS
Date: 2023
Project Wentworth Point High School
Client: SCT Consulting
Project Value: Part of $3.5B education infrastructure investment
SEE MORE DETAILS
Date: 2023
Project Accelerated Bike Network Program - Castlereagh Street North
Client: FORD CIVIL
Project Value: $710M
SEE MORE DETAILSProject: Princes Highway and Waratah Street Intersection Upgrade (Concept & Detailed Design)
Date: 2021-2022
Client: MRB Technical Services & TfNSW
Project Value: $15.2M
Service: ROAD SAFETY AUDITING


Project Description:
The Princes Hwy and Waratah St intersection is identified as a key bottleneck on the Princes Hwy. The upgrade will contribute to improved journey time and reliability along the entire corridor through Kirrawee and improve access into and out of the Kirrawee north precinct. The key features of the proposed Princes Highway and Waratah Street intersection upgrade include lane widening, provide a dedicated left turn lane from Princes Highway to Waratah Street sand provision of a signalised pedestrian crossing across Waratah Street.
Key roles and responsibilities:
Testimonial:
“D-TAL assisted MRB with the preparation of the Road Safety Audit (RSA) for the Princes Highway and Waratah Street Intersection Upgrade during both the concept design and detailed design stages. The D-TAL team completed the work professionally and in accordance with relevant standards, guidelines and policies as is required in NSW. The team explained the process clearly and provided additional suggestions on request, to help improve project outcomes. It would be a pleasure to work on future projects with the D-TAL team.”
Ahmad Issa – Design Manager
Project: Great Western Highway Upgrade – Coxs River Road Roadworks Road Safety Audit (RSA)
Date: 2022
Client: Jacobs & TfNSW
Project Value: $2.5B
Service: ROAD SAFETY AUDITING

Project Description:
Transport for NSW (TfNSW) is planning an upgrade of the Great Western Highway (HW5) between Katoomba and Lithgow as part of the Great Western Highway Upgrade program (GWHUP). This commitment aims to reduce congestion and improve reliability for those travelling within and through the Blue Mountains.
Coxs River Road (CRR) involves the upgrade of approximately 2.4 kilometres of the Great Western Highway at Coxs River Road, Little Hartley. The proposed works include a new alignment of the Great Western Highway to provide a four-lane divided carriageway and a grade separated interchange at Coxs River Road.
Key roles and responsibilities:
Testimonial:
“Daniel Talevski undertook a Road Safety Audit (RSA) for the Great Western Highway Upgrade Coxs River Road Package. Daniel’s review was of high quality and undertaken in a timely manner. The issues identified were constructive and insightful particularly the comments related to road and intersection design. Several critical road design changes were made as a result of Daniel’s review. Daniel also has a strong understanding of the TfNSW RSA requirements and process. Another positive aspect of Daniel’s services was his professionalism and his willingness to provide detailed explanations and technical advice via email and phone correspondence.”
Nathan Tang – Design Manager
Project: Bondi Junction Cycleway & Streetscape Upgrade – Stage 5 (Oxford Street)
Date: September 2021
Client: FORD CIVIL
Project Value: $6M
Service: ROAD SAFETY AUDITING

Project Description:
The Stage 5 Roadworks is part of the construction works to complete the proposed Bondi Junction Cycleway & Streetscape Upgrade Works (part of the Bondi Junction Complete Streets Project). This upgrade aims to create appealing meeting places through introducing green public areas and improving footpath connectivity for active travel including cycling, walking and access to public transport.
The proposed cycleway travels through Bondi Junction commercial centre, linking Oxford Street, Syd Einfeld Drive and Bondi Road to an existing cycleway at the north-eastern corner of Centennial Park. The project is to be completed in various stages to minimise disruption for cars, cyclists, pedestrians, and residents/businesses and specifically flow of public transport.
Key roles and responsibilities:
Testimonial:
“Daniel and his team at D-TAL completed a Road Safety Audit for my project at Bondi Junction. Daniel was very professional throughout the audit process and provided constructive feedback to not only achieve a satisfactory audit result, but to improve traffic and pedestrian management on-site.”
Jackson Lord – Site Engineer
Project: Bylong Valley Way Level Crossing
Date: February 2023
Client: BG&E & ARTC
Project Value: $14 million
Service: ROAD SAFETY AUDITING



Project Description:
The level railway crossing is located on Bylong Valley Way immediately east of the Bylong Valley Way & Wollar Road intersection, Bylong. The objective of the Road Safety Audit (RSA) is to review the existing road and level railway crossing with its surrounds and nearby roads and relevant background information to identify and report on aspects of the road environment that may result in unnecessary or unreasonable hazards for all road users.
Key role and responsibilities:
Testimonial:
“Overall, we were very satisfied with the performance of the services provided by D-TAL. The Road Safety Audit (RSA) was provided promptly, with quick turn-around of the draft report and availability for us to review and meet to discuss the findings.”
Ben Collyer – Associate (BG&E)
Project: 55-57 Hallam South Road, Hallam
Date: February 2021
Client: iSProperty
Project Value: N/A
Service: ROAD SAFETY AUDITING
RSA: Strategic Design

Project Description:
The Hallam Warehouse Development site is located at 55-57 Hallam South Road, Hallam. The development proposes a single left in/left out only access point on Hallam South Road. The objective of the Road Safety Audit (RSA) is to review the proposed development with its surrounds and nearby roads and relevant background information to identify and report on aspects of the road environment that may result in unnecessary or unreasonable hazards for all road users.
Key role and responsibilities:
Testimonial:
“We have encountered a challenging, long-term project which involved numerous stakeholders. Despite the difficulties, it’s commendable that Daniel Talevski from D-TAL and I have worked collaboratively to overcome problems and address issues throughout the design and approval process. Daniel Talevski’s shared commitment to conquering challenges highlight the importance of teamwork and collaboration in such complex scenarios. The provision of a timeline of estimated work from D-TAL is also valuable for managing expectations and ensuring that all parties involved are on the same page regarding project progress and milestones. No doubt we will always consider D-TAL for any future work.”
Amanda Di – Project Manager
Project: Heavy Vehicle Alternative Route – Withers Lane & Dead Horse Lane, Mansfield
Date: January 2022
Client: JJ RYAN
Project Value: $3.9 million
Service: ROAD SAFETY AUDITING


Project Description:
The Heavy Vehicle Alternative Route (Stage 1) Mansfield is located at Dead Horse Lane between Withers Lane and Midland Highway intersections and includes upgrade works to the Withers Lane & Maroondah Highway intersection. The works include pavement widening and intersection upgrades to improve road safety and heavy vehicle accessibility.
The objective of the Road Safety Audit (RSA) is to review the proposed development with its surrounds and nearby roads and relevant background information to identify and report on aspects of the road environment that may result in unnecessary or unreasonable hazards for all road users.
Key role and responsibilities:
Testimonial:
“We engaged Dan to assist our over-stretched engineering team with the design of several highway and local road projects in NSW and VIC. He not only has valuable road design experience and digital engineering capability, but he also integrated perfectly on a social level with our engineers and drafters. It was great to have this flexible design resource available to help us get through the peaks in our workload. I highly recommend.”
Michael Patmore – Team Leader (Civil)
Project: Port Botany Rail Duplication – Southern Cross Drive Central Pier Works – Traffic Management Plan
Date: October 2022
Client: Turnbull Engineering
Project Value: $400 million
Service: ROAD SAFETY AUDITING

Project Description:
The duplication of the Port Botany Freight Line aims to improve the efficiency and capacity of the rail connection to the port and reduce road congestion around Botany and the adjacent Kingsford Smith Airport. It will also support the intermodal terminals at Minto, Yennora, Chullora, Enfield, and Moorebank (once completed).
Temporary traffic management arrangements were implemented on Southern Cross Drive (SCD) (in both directions) at the existing Port Botany railway bridge to facilitate space for piling works and column pier installation. Work area to be located within the middle of the existing SCD median. The audit team assessed the live temporary traffic works on-site, for potential road user safety risks.
Key role and responsibilities:
Testimonial:
“D-TAL provided a professional and detailed audit service. I appreciated their responsiveness and ability to deliver within agreed timeframes allowing us to meet our project milestones. I highly recommend D-TAL’s services.”
David Lowe – Technical Director, Transport Engineering & Planning at TURNBULL ENGINEERING
Project: Epping Road Bridge
Date: February 2024
Client: Mott Macdonald
Project Value: $220 million
Service: ROAD SAFETY AUDITING




Project Description:
The Epping Bridge Project proposes to replace the existing Epping Road bridge with a new, wider, bridge. Key features of the upgrade include, an additional westbound traffic lane, an additional right turn lane eastbound from Beecroft Road onto Blaxland Road, a wider pedestrian and bicycle shared path, a raised central median, with widened eastbound and westbound lanes and installation of new safety screens on the bridge.
Key role and responsibilities:
Testimonial:
“The level of detail and findings provided are very good. In addition, I was happy that the audit was delivered quickly, especially given it was after a busy Christmas-New Year period. It would be a pleasure to work with D-TAL in the future.”
Scott Armstrong – Senior Civil Engineer
Project: Wentworth Point High School
Date: November 2023
Client: SCT Consulting
Project Value: Part of $3.5 billion education infrastructure investment
Service: ROAD SAFETY AUDITING


Project Description:
The new Wentworth Point High School is being developed to cater for the growing population in the Wentworth Point, Sydney Olympic Park and Concord West communities. The school will be located on a part of 7 Burroway Road, Wentworth Point. The high school will have flexible teaching and learning spaces for approximately 1,500 students as well as a multipurpose hall for sports and performance, outdoor spaces including landscaped recreation areas, games courts and canteen facilities. As part of the works, a pedestrian crossing is proposed on Burroway Road, east of the existing roundabout.
Key role and responsibilities:
Testimonial:
“D-TAL provided excellent quality work. The road safety audit was turned around in a rapid timeframe, which was really valuable to me as a customer. The works that he reviewed needed multiple layers of approval, so the timeframe available to between design finalisation and conducting an audit was critical path. D-TAL’s review of the road safety hazards was well thought through. When Council reviewed the design, there were no additional safety issues raised, indicating that the audit covered all the issues. This is really helpful as it reduces approval time and provides an up-front process to ensure the design is approvable. I would recommend D-TAL for further work.”
Jonathan Busch – Associate Director
Project: Accelerated Bike Network Program – Castlereagh Street North
Date: September 2023
Client: FORD CIVIL
Project Value: $710 million
Service: ROAD SAFETY AUDITING




Project Description:
Castlereagh Street Cycleway as part of the City of Sydney Accelerated Cycleways Project – Package 1A involving the construction of a separated, bi-directional cycleway along the west side of Castlereagh Street between King Street and Liverpool Street, as well as the northern side of Liverpool Street between Castlereagh Street and Elizabeth Street. The Road Safety Audit (RSA) assess temporary traffic management arrangements on Castlereagh Street to facilitate civil construction works.
Key role and responsibilities:
Testimonial:
“I have used Daniel and his team at D-TAL on a number of projects over the past 3 years. Daniel was very professional throughout the audit process and provided constructive feedback to not only achieve a satisfactory audit result, but to improve the traffic and pedestrian management onsite. At short notice, D-TAL provided a competitive quote, completed multiple site inspections, and submitted the Final Audit Report all within the space of 1 week.”
Jackson Lord – Site Engineer